Day 1 – Preparation & Bonding

Using the Tile Tracker System and tools, day one of your project using the equipment informs you of how to prepare your walls for

Videos
Day 2 – An Introduction To The Tools

Using the Tile Tracker System and tools, day two of your project using the equipment and tools.

Videos
Day 2 – Knowing Your Materials

Using the TileTracker System and tools, day two of your project using the equipment informs you of how to prepare your walls for tiling,

Videos
Corner Plugs And The 0.75 m Tracks

The Corner Plugs or Universal Spacers (UNIPLUG) are used not only in cross sections of tiles, but at corners as well. When using these

Videos
Day 2 – Preparation & Bonding

Using the Tile Tracker System and Suretile tools, day two of your project using the equipment informs you of how to prepare your walls

Videos
Day 2 – Adding Or Moving The Tile Tracker System

Moving The Tile Tracker System to complete the rest of the wall.

Videos
Day 2 – Applying Adhesive

Using the Tile Tracker System and Suretile tools to apply adhesive to a wall correctly.

Videos
Day 2 – Starting To Tile

Using the Tile Tracker System and tools, to begin your first course of tiles on a wall.

Videos
Day 2 – Adding A Second Course Of Tiles

Using the Tile Tracker System and Suretile tools to add a second course of tiles.

Videos
Day 2 – Working Between A Door On An Opposite Wall

The advantage to The Tile Tracker System is that you not work faster and more efficiently, but safely as well. You no longer need

Videos
TileTracker Removal And Re-Use

It is easy to remove the system from the wall, simply turn the adjustable legs anti-clockwise to lift them up to approximately 1 cm

Videos
Day 3 – The End Of A Hire Period

Results at the end of a hire period after the customer had finished his tiling project.

Videos
Day 3 – End Of Hire Period On-Site Training

After one day of tiling the hire customer completes 8 square meters of tiling which even some professionals would struggle to achieve.

Videos